Categories: Business

Flight to London-Gatwick: the First machine at the capital airport BER is lifted

Flight To London-Gatwick
First machine at the capital airport BER is lifted

The Easyjet machine with 64 passengers and a flight to London-Gatwick rolls out to the Start. Photo: Soeren Stache/dpa-Central picture/dpa

© dpa-infocom GmbH

The next step in the opening procedure for the BER: After the first arrivals on Saturday can now check-in for passengers there. There are, however, not moved far from all of airlines.

At the new capital airport BER, it has given the first official departure. An Easyjet machine with 64 passengers and a flight to London Gatwick took off in the Morning in Schönefeld.

A total of 23 take-offs and landings were on Sunday on the flight plan for the new Terminal, such as from and to Zurich, Istanbul and Gran Canaria.

The new airport with the nickname of Willy Brandt, was opened on Saturday. After two landings with invited guests in the afternoon several planes brought the evening’s first vacationers to the Gates of the airport.

The Airlines moving to and from Tegel airport and from the old schönefelder Terminal to the new building. In addition to Easyjet wanted to welcome on Sunday, Turkish Airlines and Qatar Airways passengers in Terminal 1. In the course of the week, more moves to follow. As the last of the Lufthansa group moved to Schönefeld, before on 8. November, the Tegel airport will be closed.

First of all, the machines use the runway of the old airport Schönefeld, which is part of the BER. The newly built runway of the South on Wednesday in operation. Then position the new airport for the purposes of the Plan as put into operation.

Berlin and Brandenburg have been waiting for this for a long time. Originally, the BER should go into operation in 2011. The construction was characterised by planning errors, technical problems, and construction defects. Six Times the opening has been postponed. The cost of construction and the noise protection of local residents tripled to Around six billion euros.

The three Terminals of the BER can accommodate up to 41 million passengers in the year. Thus, Berlin would be the third largest airport in Germany after Frankfurt and Munich. This year it will be because of the Corona-crisis, but are expected to be only about 10 million passengers.

dpa
Matthew Velter

With 5 years of experience as an editor, Matthew has been a crucial part of eTrendy Stock since its inception. He looks after the editing of news content published on eTrendy Stock. Apart from investing his time in editing, he also provides well-researched news articles for the U.S. niche. Mathew studied at University of central Florida.

Recent Posts

Moscow Exchange Plans Crypto Indices for Solana, XRP, Tron

The Moscow Exchange intends to introduce new cryptocurrency indices tracking Solana, Ripple’s XRP, and Tron…

24 hours ago

Jupiter Secures $35M Strategic Investment From ParaFi Capital to Accelerate Onchain Financial Infrastructure

The partnership reflects a long-term alignment between ParaFi and Jupiter, grounded in conviction around the…

2 days ago

Binance SAFU Fund Begins $1B Shift to Bitcoin

Binance strengthened its emergency user protection reserves on February 2, 2026, when the Secure Asset…

2 days ago

WeChange Launches Across 190+ Countries to Expand Crypto Access Worldwide

Budapest, Hungary, 2nd February 2026, ZEX PR WIRE— WeChange, a noncustodial global crypto onramp, announces…

2 days ago

Securitize SPAC Merger Advances With 841% Revenue Growth

Tokenization platform Securitize reported sharp revenue growth in a new regulatory filing as it moves…

5 days ago

Elysium and Spotex Deliver Integrated Front-to-Back Digital Asset Trading Solution for the Institutional Market

Elysium and Spotex Deliver Integrated Front-to-Back Digital Asset Trading Solution for the Institutional Market  Decade-Long…

5 days ago