Categories: Business

Flight to London-Gatwick: the First machine at the capital airport BER is lifted

Flight To London-Gatwick
First machine at the capital airport BER is lifted

The Easyjet machine with 64 passengers and a flight to London-Gatwick rolls out to the Start. Photo: Soeren Stache/dpa-Central picture/dpa

© dpa-infocom GmbH

The next step in the opening procedure for the BER: After the first arrivals on Saturday can now check-in for passengers there. There are, however, not moved far from all of airlines.

At the new capital airport BER, it has given the first official departure. An Easyjet machine with 64 passengers and a flight to London Gatwick took off in the Morning in Schönefeld.

A total of 23 take-offs and landings were on Sunday on the flight plan for the new Terminal, such as from and to Zurich, Istanbul and Gran Canaria.

The new airport with the nickname of Willy Brandt, was opened on Saturday. After two landings with invited guests in the afternoon several planes brought the evening’s first vacationers to the Gates of the airport.

The Airlines moving to and from Tegel airport and from the old schönefelder Terminal to the new building. In addition to Easyjet wanted to welcome on Sunday, Turkish Airlines and Qatar Airways passengers in Terminal 1. In the course of the week, more moves to follow. As the last of the Lufthansa group moved to Schönefeld, before on 8. November, the Tegel airport will be closed.

First of all, the machines use the runway of the old airport Schönefeld, which is part of the BER. The newly built runway of the South on Wednesday in operation. Then position the new airport for the purposes of the Plan as put into operation.

Berlin and Brandenburg have been waiting for this for a long time. Originally, the BER should go into operation in 2011. The construction was characterised by planning errors, technical problems, and construction defects. Six Times the opening has been postponed. The cost of construction and the noise protection of local residents tripled to Around six billion euros.

The three Terminals of the BER can accommodate up to 41 million passengers in the year. Thus, Berlin would be the third largest airport in Germany after Frankfurt and Munich. This year it will be because of the Corona-crisis, but are expected to be only about 10 million passengers.

dpa
Matthew Velter

With 5 years of experience as an editor, Matthew has been a crucial part of eTrendy Stock since its inception. He looks after the editing of news content published on eTrendy Stock. Apart from investing his time in editing, he also provides well-researched news articles for the U.S. niche. Mathew studied at University of central Florida.

Recent Posts

Atelier Home Sets a New Standard for Luxury Home Decor

Berlin, Germany, 2nd July 2025, In the heart of Europe’s design capital, a new name…

4 hours ago

WEMADE and Redlab Games Unleash Blockbuster Web3 MMORPG – ROM: Golden Age – Global Pre-Registration Now Open for August 2025 Launch!

Singapore, 2nd July 2025, ZEX PR WIRE, WEMADE and Redlab Games are thrilled to announce…

18 hours ago

Angry Pepe Fork Unveils Deflationary Roadmap as PI Network Crosses 60M Users

New York, USA, 1st July 2025, ZEX PR WIRE, While PI Network officially passes 60…

2 days ago

Tradeview Secures Prestigious SCA Category 5 License, Unlocking New Growth Opportunities in the UAE

Dubai, UAE, 1st July 2025, ZEX PR WIRE, In a bold step forward for its…

2 days ago

NodeOps Network $NODE Token Generation Event Sells Out in Minutes via Binance Wallet, Debuts Across Top Global Exchanges

Dubai, UAE, 30th June 2025, ZEX PR WIRE, NodeOps Network is thrilled to announce the…

2 days ago

LF Labs (LF Coin) Breakout Steals Spotlight as Shiba Inu Price Targets $0.000017 Return

Dubai, UAE, 30th June 2025, ZEX PR WIRE, LF Labs (LF Coin) gained momentum today…

2 days ago