Categories: Business

Flight to London-Gatwick: the First machine at the capital airport BER is lifted

Flight To London-Gatwick
First machine at the capital airport BER is lifted

The Easyjet machine with 64 passengers and a flight to London-Gatwick rolls out to the Start. Photo: Soeren Stache/dpa-Central picture/dpa

© dpa-infocom GmbH

The next step in the opening procedure for the BER: After the first arrivals on Saturday can now check-in for passengers there. There are, however, not moved far from all of airlines.

At the new capital airport BER, it has given the first official departure. An Easyjet machine with 64 passengers and a flight to London Gatwick took off in the Morning in Schönefeld.

A total of 23 take-offs and landings were on Sunday on the flight plan for the new Terminal, such as from and to Zurich, Istanbul and Gran Canaria.

The new airport with the nickname of Willy Brandt, was opened on Saturday. After two landings with invited guests in the afternoon several planes brought the evening’s first vacationers to the Gates of the airport.

The Airlines moving to and from Tegel airport and from the old schönefelder Terminal to the new building. In addition to Easyjet wanted to welcome on Sunday, Turkish Airlines and Qatar Airways passengers in Terminal 1. In the course of the week, more moves to follow. As the last of the Lufthansa group moved to Schönefeld, before on 8. November, the Tegel airport will be closed.

First of all, the machines use the runway of the old airport Schönefeld, which is part of the BER. The newly built runway of the South on Wednesday in operation. Then position the new airport for the purposes of the Plan as put into operation.

Berlin and Brandenburg have been waiting for this for a long time. Originally, the BER should go into operation in 2011. The construction was characterised by planning errors, technical problems, and construction defects. Six Times the opening has been postponed. The cost of construction and the noise protection of local residents tripled to Around six billion euros.

The three Terminals of the BER can accommodate up to 41 million passengers in the year. Thus, Berlin would be the third largest airport in Germany after Frankfurt and Munich. This year it will be because of the Corona-crisis, but are expected to be only about 10 million passengers.

dpa
Matthew Velter

With 5 years of experience as an editor, Matthew has been a crucial part of eTrendy Stock since its inception. He looks after the editing of news content published on eTrendy Stock. Apart from investing his time in editing, he also provides well-researched news articles for the U.S. niche. Mathew studied at University of central Florida.

Recent Posts

Sunny Mining Unveils Weekend Incentive Contracts for Short-Term Crypto Profits

Los Angeles, California, 22nd August 2025, ZEX PR WIRE, As digital assets gain increasing attention,…

2 days ago

Price pullbacks are no longer the end: APT miners help XRP investors lock in daily gains

Los Angeles, California, 22nd August 2025, ZEX PR WIRE, After XRP once again fell below…

2 days ago

Irys Raises $10M Series A to Unlock $3 Trillion Data Economy With First Programmable Datachain

CoinFund-Led Round Accelerates Institutional Adoption of Infrastructure For Datachains London, UK, Aug 22, 2025, ZEX…

2 days ago

BJMINING Attracts Thousands of New Users Amid Crypto Rally, Delivering $7,000 Daily Returns

London, UK, 22nd August 2025, ZEX PR WIRE- With the launch of Bitcoin and Ethereum…

2 days ago

XRP holders cash out $5,777 per day through secure blockchain cloud mining.

Start your journey to wealth with one click. Miami, Florida, 22nd August 2025, ZEX PR…

2 days ago

PlanMining Helps XRP Investors Earn $8,800 in Passive Income Daily

London, England, 22nd August 2025, ZEX PR WIRE, In today’s volatile cryptocurrency market, maintaining asset…

2 days ago