Categories: Business

Flight to London-Gatwick: the First machine at the capital airport BER is lifted

Flight To London-Gatwick
First machine at the capital airport BER is lifted

The Easyjet machine with 64 passengers and a flight to London-Gatwick rolls out to the Start. Photo: Soeren Stache/dpa-Central picture/dpa

© dpa-infocom GmbH

The next step in the opening procedure for the BER: After the first arrivals on Saturday can now check-in for passengers there. There are, however, not moved far from all of airlines.

At the new capital airport BER, it has given the first official departure. An Easyjet machine with 64 passengers and a flight to London Gatwick took off in the Morning in Schönefeld.

A total of 23 take-offs and landings were on Sunday on the flight plan for the new Terminal, such as from and to Zurich, Istanbul and Gran Canaria.

The new airport with the nickname of Willy Brandt, was opened on Saturday. After two landings with invited guests in the afternoon several planes brought the evening’s first vacationers to the Gates of the airport.

The Airlines moving to and from Tegel airport and from the old schönefelder Terminal to the new building. In addition to Easyjet wanted to welcome on Sunday, Turkish Airlines and Qatar Airways passengers in Terminal 1. In the course of the week, more moves to follow. As the last of the Lufthansa group moved to Schönefeld, before on 8. November, the Tegel airport will be closed.

First of all, the machines use the runway of the old airport Schönefeld, which is part of the BER. The newly built runway of the South on Wednesday in operation. Then position the new airport for the purposes of the Plan as put into operation.

Berlin and Brandenburg have been waiting for this for a long time. Originally, the BER should go into operation in 2011. The construction was characterised by planning errors, technical problems, and construction defects. Six Times the opening has been postponed. The cost of construction and the noise protection of local residents tripled to Around six billion euros.

The three Terminals of the BER can accommodate up to 41 million passengers in the year. Thus, Berlin would be the third largest airport in Germany after Frankfurt and Munich. This year it will be because of the Corona-crisis, but are expected to be only about 10 million passengers.

dpa
Matthew Velter

With 5 years of experience as an editor, Matthew has been a crucial part of eTrendy Stock since its inception. He looks after the editing of news content published on eTrendy Stock. Apart from investing his time in editing, he also provides well-researched news articles for the U.S. niche. Mathew studied at University of central Florida.

Recent Posts

Allbridge Core Exploit: $1.65M Drained, Bridge Paused

Allbridge paused its Core cross-chain stablecoin bridge on July 19 after an attacker pulled roughly…

2 hours ago

Where GCC’s Most Consequential Business Decisions Get Made

AJMS Group and Marmin AI launch the CXO Boardroom Series in Dubai, a curated executive…

3 days ago

GivTrade’s UAE CMA Category 5 Licence Brings Greater Transparency and a More Verified, User-Friendly Trading Experience

Broker confirms UAE and Mauritius licences cover distinct parts of its business, while independent reviews…

6 days ago

Caladan Extends Aggregated Digital Asset Liquidity to zerohash’s Ecosystem

Integration expands the diversity of liquidity available to banks, brokerages, and fintechs powered by zerohash…

1 week ago

Dubai Health and Rush University System for Health Announce Strategic Collaboration to Advance Quality of Care

Dubai, United Arab Emirates, 10th July 2026: Dubai Health has announced a strategic collaboration with Rush…

2 weeks ago

Ajman Bank Successfully Prices Inaugural USD 300 Million Additional Tier 1 Perpetual Sukuk

Dubai, United Arab Emirates, Jul 09, 2026 — Ajman Bank, rated BBB+ (Stable) by Fitch, has successfully…

2 weeks ago